Jan 31, 2022
C_DIR
SIGNE
51.5 million
FCFA
06/M/C.DIR/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 01 BLOCS DE 02 SALLES DE CLASSE EQUIPEES DE 60 TABLE BANCS AVEC BLOC ADMINISRATIF CONSTRUCTION D UN BLOC DE LATRINES ECOLOGIQUES A 03 CABINES ET REHABILITATION DE 02 BLOCS DE 02 SALLES DE CLASSES EQUIPEES DE 120 TABLE BANCS AL EP DE KOUNDE
Jan 31, 2022
C_DJOHONG
SIGNE
51.1 million
FCFA
04/M/CD/CIPM/2022
TRAVAUX DE COSTRUCTION DE 02 BLOCS DE 02 SALLES DE CLASSES EQUIPEES DE 120 TABLES BANC DONC UN AVEC BLOC ADMINISTRATIF ET BLOC DES LATRINES ECOLOGIQUES A TROIS CABINES A LEP DE OURO ADE