Construction of a water catchment and a tank 10m3 and extension by 1.5km and rehabilitation of the already existing line destroyed by the landslide by 2km at Njinikejem.
Extension of Electricity to Alamandom
May 16, 2023
C_BAMENDA_II
SIGNE
14.5 million
FCFA
05/JO/BIICITB/BIIC/BIISD/Mezam/NWR/2023
Construction of a borehole equipped with solar pump with 10m elevated storage tank of 3 cubic in Nsongwa
Reforestation Of Council Forest In BAMENDA I