sort by date sort by cost
Total 2 entries found , Cost: 39.5 million FCFA
2019 C_MBENGWI ATTRIBUE
CONSTRUCTION OF A SLAUGHTER HOUSE EQUIPED WITH OVERHEAD RAIL IN MBENGWI
May 15, 2018 C_NJIKWA RECEPTIONNE 39.5 million FCFA 17/JO/MINMAP/RDNW/DDMOMO/DTB/2018
Rehabilitation of the reception facility at the oshie touristic site.

Top Dates