Total 5 entries found , Cost: 56.4 million FCFA
2021 C_LIMBE_I ATTRIBUE
Construction of a borehole equipped with manual pump MOKEBA FAR
Jul 03, 2021 C_TIKO SIGNE 12.0 million FCFA 001/C/MAYOR/TIKO/TCTB/21
Equipping of the mother and child unit at the medicalised health centre Mutengene
Jun 11, 2021 C_LIMBE_III SIGNE 20.7 million FCFA 012/JO/LIIIC/FAKO/PIB/2021
Construction of a borehole with distribution network at Man O` Bay
May 03, 2021 C_LIMBE_III SIGNE 7.9 million FCFA NO 005/LIIIC/FAKO/PIB/2021
THE COMPLETION OF BOREHOLE WITH TANK AND DISTRIBUTION NETWORK AT BONANGOMBE LIMBE III
May 03, 2021 C_LIMBE_III SIGNE 15.8 million FCFA NO 004/JO/LIIIC/FAKO/PIB/2021
FOR THE CONSTRUCTION OF TWO MANUEL PUMP BOREHOLES IN UPPER MBONJO-LIMBE III