sort by date sort by cost
Total 3 entries found , Cost: 19.0 million FCFA
For the construction socioeconomic infrastructures relating to some border kits in Nwa, for the construction of a block of two (02) classrooms G.S KOFFA NWA
2018 C_NKAMBE ATTRIBUE
NKAMBE: Construction of a slaughter house equiped with overhead rail
Apr 16, 2018 C_NDU SIGNE 19.0 million FCFA 002/JO/MINMAP/RDNW/DDD-M/DTB/NKAMBE/2018
GS MBAKUP: Construction of 02 Classrooms - NDU COUNCIL

Top Dates