Rehabilitation of the road section from Konene to Barenda Hill by 5km and stone pavement of Barenda Hill by 1km.
Maintenance of the road sections Fonfuka- Mungong by 10km and pavement of 800m section between IPS Mungong and Mallam Musa.
Apr 15, 2024
C_FONFUKA
SIGNE
27.0 million
FCFA
00002/JO/ONIT/MINDDEVEL/FC/FCITB/PIB/2024
Maintenance of the road sections Fonfuka- Mungong by 10km and pavement of 800m section between IPS Mungong and Mallam Musa.
Apr 15, 2024
C_FONFUKA
SIGNE
38.0 million
FCFA
00001/JO/ONIT/MINDDEVEL/FC/FCITB/PIB/2024
Rehabilitation of the road section from Konene to Barenda Hill by 5km and stone pavement of Barenda Hill by 1km.
Rehabilitation of seven (07) Culverts ( 5 box culverts in stone masonry and 2 culverts rings of diameter 1000mm) along the stretch of road Fonfuka- Mbamlu- Saff- Konene.
Apr 10, 2023
C_FONFUKA
RECEPTIONNE
70.5 million
FCFA
0000/C/ONIT/MINDDEVEL/FC/FCITB/PIB/2023
Rehabilitation of seven (07) Culverts ( 5 box culverts in stone masonry and 2 culverts rings of diameter 1000mm) along the stretch of road Fonfuka- Mbamlu- Saff- Konene.