sort by date sort by cost
Total 3 entries found , Cost: 1.9 billion FCFA
2017 C_FOKOUE ATTRIBUE
Scan water Fokoue: Réhabilitation de l`adduction d`eau potable gravitaire
Apr 16, 2018 CAMWATER ATTRIBUE 1.5 billion FCFA 0071/M/MINMAP/SG/DGMI/DMAI/CE2/kmf/18
Travaux d`adduction en eau potable de deux centres secondaires
Prestataire: PREMIER ENTERPRISE 1months
Dec 29, 2017 GP_DERUDEP SIGNE 408.5 million FCFA 35/2017/GRASSFIELD11/B/03/01
RELAUNCH CONSTRUCTION OF 03 SMALL IRRIGATION SCHEMES IN SANTA TUBAH PRODUCTION BASINS IN THE NORTH WEST REGION
Prestataire: PREMIER ENTERPRISE INACTIF -2months

Top Prestataires
Top Dates