sort by date sort by cost
Total 6 entries found , Cost: 3.5 billion FCFA
2023 MINTP ATTRIBUE
Construction des ponts Acrow Lot 2 : Nkolandom (Inter N2) - Makomo
Apr 16, 2018 CAMWATER SIGNE 1.5 billion FCFA 0071/M/MINMAP/SG/DGMI/DMAI/CE2/kmf/18
Travaux d`adduction en eau potable de deux centres secondaires
Prestataire: PREMIER ENTERPRISE 1months
Mar 23, 2018 C_NDU SIGNE 96.9 million FCFA 02/C/MINMAP/RDNW/2018
SUPPLY AND INSTALLATION OF 54 SOLAR STREET LIGHT FOR `ALL IN ONE` AND 18 SOLAR STREET LIGHTS `ALL IN 2` IN SOME MAJOR ROADS AND JUNCTIONS IN NDU
Prestataire: PREMIER ENTERPRISE 0months
2017 C_FOKOUE ATTRIBUE
Scan water Fokoue: Réhabilitation de l`adduction d`eau potable gravitaire
Apr 16, 2018 CAMWATER ATTRIBUE 1.5 billion FCFA 0071/M/MINMAP/SG/DGMI/DMAI/CE2/kmf/18
Travaux d`adduction en eau potable de deux centres secondaires
Prestataire: PREMIER ENTERPRISE 1months
Dec 29, 2017 GP_DERUDEP SIGNE 408.5 million FCFA 35/2017/GRASSFIELD11/B/03/01
RELAUNCH CONSTRUCTION OF 03 SMALL IRRIGATION SCHEMES IN SANTA TUBAH PRODUCTION BASINS IN THE NORTH WEST REGION
Prestataire: PREMIER ENTERPRISE INACTIF -2months

Top Prestataires