sort by date sort by cost
Total 7 entries found , Cost: 63.0 million FCFA
2023 C_KUMBA_I ATTRIBUE
Rehabilitation of three (03) classrooms at GBPS Kumba Mbeng Group I.
2023 C_KUMBA_II ATTRIBUE
Construction of a(One) classroom at G.S Ekema.
2023 C_KUMBA_III ATTRIBUE
Construction of a professional training center in Mambanda.
2023 CU_KUMBA ATTRIBUE
FOR THE PRE-COLLECTION OF HOUSE HOLD MUNICIPAL SOLID WASTE FROM INACCESSIBLE POINTS,TRANSPORTATION TO ACCESSIBLE POINTS AND DREDGING OF WATER WAYS AND GUTTERS LOT 3
May 24, 2023 C_KUMBA_II SIGNE 13.0 million FCFA N003/JO/KUMBA II/MEME/ITB/2023
Construction of a(One) classroom at G.S Ekema.
May 17, 2023 C_KUMBA_I SIGNE 20.0 million FCFA N04/JO/KUMBAI/MEME/ITB/2023
Rehabilitation of three (03) classrooms at GBPS Kumba Mbeng Group I.
May 02, 2023 C_KUMBA_III SIGNE 30.0 million FCFA N06/JO/KUMBA III/MEME/ITB/2023
Construction of a professional training center in Mambanda.

Top Prestataires
Top Dates