sort by date sort by cost
Total 2 entries found , Cost: 25.2 million FCFA
Oct 05, 2017 C_BASCHEO SIGNE 6.2 million FCFA 028/LC/MINMAP/DR-NO/CRPM-NO/SMS/2017
Maitrise d`eouvre des travaux de Construction de dix forages équipés de PMH à WOURO KODJOLLI, WOURO GUIDANG, TCHIKRE, BARGOUNA, MBALLA, WOURO BAADI, MANAWASSI, DJAMBOUTOU BASHEO, ZARIA KOBOSSI ET A LA MAIRIE DE BASHEO.
Prestataire: NATURGC SARL INACTIF
Jul 31, 2017 DR_MINHDU_EN SIGNE 19.0 million FCFA 069/LC/PR/MINMAP/SG/DREN/CRPM-SPI/SMAS/BSMA/17
Maîtrise d`oeuvre pour les Travaux de construction de la DREN/MINHDU ( phase V)
Prestataire: NATURGC SARL INACTIF

Top Prestataires
Top Dates