sort by date sort by cost
Total 2 entries found , Cost: 42.8 million FCFA
Aug 09, 2022 ADC SIGNE 18.8 million FCFA 08/LC/ADC/CIPM/2022
POUR LA REFECTION DES TOILTTE DE L`AEROGARE PASSAGERS DE NGOUNDERE
Prestataire: MIRACLE DRILLING MISSING
Jun 10, 2022 C_BANGANGTE RECEPTIONNE 24.0 million FCFA 03/LC/PR/MINMAP/DRO/DDNDE/C-BGTE/SPM/CIPM/2022
Construction d`une AEP Solaire à Bitchoua (Lot 3)
Prestataire: MIRACLE DRILLING MISSING

Top Authorities
Top Prestataires
Top Dates