sort by date sort by cost
Total 3 entries found , Cost: 29.1 million FCFA
2017 GTC_MUYENGE ATTRIBUE
Construction of workshop at GTC Muyenge
Prestataire: JOHNCO CONSTRUCTION MULTIPLE
Jul 20, 2017 CU_LIMBE SIGNE 21.1 million FCFA 30/2017
reconstruction of damaged wing wall on the bridge over Limbe river at Zoo
Prestataire: JOHNCO CONSTRUCTION MULTIPLE
Jun 30, 2017 C_LIMBE_I SIGNE 8.0 million FCFA N 15\JO\MINMAP\FAKO\FDTB\PIB\2017
Equipment of IHC Ewongo
Prestataire: JOHNCO CONSTRUCTION MULTIPLE

Top Prestataires
Top Dates