sort by date sort by cost
Total 3 entries found , Cost: 95.1 million FCFA
Aug 18, 2022 SCDP SIGNE 17.9 million FCFA 022/M/DG/DTEC/SDMIM/SMI/CIPM-SCDP/2022
FOURNITURE DE MATERIEL DE CHAUDRONNERIE ET AUX TRAVAUX DE VISITE DECENALE POUR LA MISE EN CONFORMITE DES RESERVOIRS DE STOCKAGE ET LES DEPOTS SCDP BESSENGUE ET BONABERI A DLA ,DE NSAM ET OLEZOA AYNDE ET GAROUA
Prestataire: ICEG
May 05, 2022 SCDP SIGNE 44.6 million FCFA 009/M/DG/DTEC/SDMIM/SMI/CIPM-SCDP/2022
TRAVAUX DE LESSIVAGE DE DIX SEPT (17) RESERVOIRS AU DEPOT SCDP DE BESSENGUE ET DE TROIS (03) RESERVOIRS AU DEPOT SCDP DE MBOPPI. LOT 2 : Travaux de lessivage des réservoirs N°12, 14, 15, 16,17, 18 et Slop N° 1 du dépôt SCDP de Bessengue à Douala.
Prestataire: ICEG
May 05, 2022 SCDP SIGNE 32.6 million FCFA 010/M/DG/DTEC/SDMIM/SMI/CIPM-SCDP/2022
TRAVAUX DE LESSIVAGE DE DIX SEPT (17) RESERVOIRS AU DEPOT SCDP DE BESSENGUE ET DE TROIS (03) RESERVOIRS AU DEPOT SCDP DE MBOPPI. LOT 1 : Travaux de lessivage des réservoirs N°1, 2, 3, 4, 5, 6, 9,10,11 et Slop N°2 du dépôt SCDP de Bessengue à Douala.
Prestataire: ICEG

Top Authorities
Top Prestataires
Top Dates