sort by date sort by cost
Total 2 entries found , Cost: 26.9 million FCFA
2024 C_MEIGANGA ATTRIBUE
Travaux de construction d`u pont sur le pont fleuve LOM a WAKASSO
Prestataire: HYTRA S.A
May 25, 2023 C_LOKOUNDJE SIGNE 26.9 million FCFA 015/LC/CLKJ/2023
POUR LES TRAVAUX DE CONSTRUCTION DU TRONÇON DE ROUTE EN TERRE :LOBE-DOUMALE (USINE DES EAUX CAMWATER) D`UNE LONGUEUR DE 4 KM
Prestataire: HYTRA S.A

Top Prestataires
Top Dates