sort by date sort by cost
Total 3 entries found , Cost: 148.0 million FCFA
Aug 09, 2021 C_NGUELEMENDOUKA SIGNE 117.4 million FCFA 002/M/SG/ST/C.NKA/CIPM/2021
Travaux d’entretien du tronçon de Route Régionale NGUELEMENDOUKA – LAMBA – AKOSSA – Limite MBOMA et bretelles (Carrefour LAMBA – Carrefour BATITOUM et LAMBA – MIAMBO) dans l’Arrondissement deNGUELEMENDOUKA
Prestataire: HMO CAMEROON SARL 7months
Jul 05, 2021 ANAFOR SIGNE 23.2 million FCFA 2245/LC/ANAFOR/DG/SAM/21
TRAVAUX D`ACHEVEMENT DE LA CONSTRUCTION DU BATIMENT ADMINISTRATIF ET COMMERCIAL DE LA PEPINIERE CENTRALE DE MELEN (YAOUNDE) EN 02 LOTS
Prestataire: HMO CAMEROON SARL 6months
Jul 05, 2021 ANAFOR SIGNE 7.5 million FCFA 2245/LC/ANAFOR/DG/DRP/SAM/21
TRAVAUX D`ACHEVEMENT DE LA CONSTRUCTION DU BATIMENT ADMINISTRATIF ET COMMERCIAL DE LA PEPINIERE CENTRALE DE MELEN (YAOUNDE) EN 02 LOTS
Prestataire: HMO CAMEROON SARL 6months

Top Prestataires
Top Dates