sort by date sort by cost
Total 2 entries found , Cost: 113.7 million FCFA
Jan 22, 2019 ADC ATTRIBUE 73.7 million FCFA 33/M/ADC/DG/CIPM/2019
Fourniture du mobilier des salons vips (afamba, mefou et gold de l` Aéroport de Yaoundé nsimalen
Jun 29, 2018 DR_MINEE_SU SIGNE 40.0 million FCFA 021/LC/PR/MINMAP/SG/DRMAP-SU/SMI/CRPM/18
Axe Efoulan Bengbis : Electrification rurale (phase 3) (lot 2)

Top Authorities
Top Dates