sort by date sort by cost
Total 6 entries found , Cost: 302.5 million FCFA
Jul 18, 2024 CU_NGAOUNDERE SIGNE 40.0 million FCFA 003/LC/MO/CIPM/C-TIB/2024
Construction du pont SOTUBA (lot 2)
Jul 18, 2024 CU_NGAOUNDERE SIGNE 35.0 million FCFA 003/LC/CUN/SG/DT/CIPM/2024
Construction du pont YOKO (lot 1)
Jan 22, 2019 ADC RECEPTIONNE 73.7 million FCFA 33/M/ADC/DG/CIPM/2019
Fourniture du mobilier des salons vips (afamba, mefou et gold de l` Aéroport de Yaoundé nsimalen
Jun 29, 2018 DR_MINEE_SU RECEPTIONNE 40.0 million FCFA 021/LC/PR/MINMAP/SG/DRMAP-SU/SMI/CRPM/18
Axe Efoulan Bengbis : Electrification rurale (phase 3) (lot 2)
Jan 22, 2019 ADC ATTRIBUE 73.7 million FCFA 33/M/ADC/DG/CIPM/2019
Fourniture du mobilier des salons vips (afamba, mefou et gold de l` Aéroport de Yaoundé nsimalen
Jun 29, 2018 DR_MINEE_SU SIGNE 40.0 million FCFA 021/LC/PR/MINMAP/SG/DRMAP-SU/SMI/CRPM/18
Axe Efoulan Bengbis : Electrification rurale (phase 3) (lot 2)