sort by date sort by cost
Total 14 entries found , Cost: 2.1 billion FCFA
Dec 08, 2022 HYDRAC SIGNE 369.5 million FCFA 01/M/HYDRAC/CIPM/2022
TRAVAUX DE PARACHEVEMENT DE LA PHASE 1 DE LA CONSTRUCTION D`UN COMPLEXE DE LABORATOIRE AU SIEGE DE HYDRAC
Oct 12, 2022 HGD SIGNE 49.9 million FCFA LC n°031/MP/HGD/CIPM/2022
Travaux d’aménagement de l’entrée de la Cobaltothérapie
Jul 04, 2022 ONCC SIGNE 231.8 million FCFA 001/M/ONCC/CIPM/2022
Réaménagement du laboratoire d`Akwa
May 05, 2022 MINESEC SIGNE 49.5 million FCFA 05/22/LC/GG/MINESEC/DRFM/CIPM/2022
Travaux de réhabilitation des infrastructure sinistres au lycee technique d`Ombe
2020 UNIV_BAMENDA ATTRIBUE
EXECUTION OF CONSTRUCTION OF THE UBAdef PEDAGOGIC BLOCK IN THE UBa
Dec 21, 2020 MINESEC SIGNE 149.2 million FCFA 77/20/M/GG/MINESEC/DRFM/CIPM/20
Travaux de construction et équipements ( LIMBE)
Dec 21, 2020 MINESEC SIGNE 149.2 million FCFA 77/20/M/GG/MINESEC/DRFM/CIPM/2020
Travaux de construction d`un bloc pédagogique de huit (8 ) salles de classes (4) bureaux et toilettes en R+1 au lycée Technique de LIMBE.
Mar 26, 2020 FEICOM SIGNE 457.4 million FCFA 003/M/FEICOM/DG/DMRF CP/SMA/20
EXECUTION DES TRAVAUX DE FINITIONS DE L IMMEUBLE DEVANT ABRITER LES SERVICES REGIONAUX DU FEICOM POUR LE SUD OUEST A LIMBE
Oct 03, 2019 MINESEC SIGNE 87.3 million FCFA 64/19/M/GG/MINESEC/CIPM/2019
Travaux de réhabilitation des infrastructures scolaires du lycée Joss à Douala région du littoral
Jul 18, 2019 UNIV_BUEA SIGNE 24.6 million FCFA 00019/ub/dppi
Execution of external works around the administrative and pedagogic block of the advanced school of translators and interpreters at the university of Buea
May 07, 2019 MINESEC SIGNE 46.0 million FCFA 25/19/LC/GG/MINESEC/CIPM/2019
travaux de réhabilitation des infrastructures scolaires sinistrées au Lycée d`Obala et au lycée bilingue d`Obala
Prestataire: GROUP WAGA INC LTD INACTIF
2018 UNIV_YAOUNDE_II ATTRIBUE
TRAVAUX DE REHABILITATION DE LA MAISON DE LENSEIGNANT DE LUNIVERSITE DE YDE II
Oct 17, 2018 UNIV_BAMENDA SIGNE 489.7 million FCFA 18-009/M/UBa/CIPM/2018
Construction of the administrative and of pedagogic and block of FHS in the Bambili Campus of the UBa
2017 MINESUP ATTRIBUE
travaux d`aménagement des VRD à la faculté de médecine et des sciences pharmaceutiques de l`université de DOUALA

Top Prestataires