sort by date sort by cost
Total 3 entries found , Cost: 26.5 million FCFA
2023 CR_SW ATTRIBUE
FOR THE CONSTRUCTION OF TWO (02) MANUAL BOREHOLES FOR OSING VILLAGE - EYUMOJOCK.
2023 C_EYUMOJOCK ATTRIBUE
Construction of potable water catchment at Eyumojock Town
Apr 26, 2023 SOWEDA SIGNE 26.5 million FCFA 004/23/JO/MINADER-PIB/2023
Studies and Construction of Water Schemes (Boreholes) at Bekanjo Village, Bakogo Village and Moko Village

Top Dates