sort by date sort by cost
Total 14 entries found , Cost: 154.5 million FCFA
2023 C_LIMBE_I ATTRIBUE
OPENING OF FARM TO MARKET ROAD IN MAWOH FROM LATE QUARTER HEAD`S RESIDENCE TO G.S MAWOH TO MBANDA BLACK BUSSH 1 KM PHASE 2
2023 C_LIMBE_II ATTRIBUE
Maintenace of communal roads in Limbe II: opposite the shipyard entrance to council grandstand
Apr 27, 2023 C_LIMBE_I SIGNE 30.0 million FCFA 10/JO/L.I.C/FAKO/LIMBE ITB/PIB 2023
Green space at Limbe 1
Apr 17, 2023 C_LIMBE_I SIGNE 16.0 million FCFA 002/JO/L.I.C/FAKO/LIMBE ITB/PIB 2023
OPENING OF FARM TO MARKET ROAD IN MAWOH FROM LATE QUARTER HEAD`S RESIDENCE TO G.S MAWOH TO MBANDA BLACK BUSSH 1 KM PHASE 2
2022 C_LIMBE_II ATTRIBUE
Construction of a Fishery market at WOVIA
2022 C_LIMBE_I ATTRIBUE
Opening of a Farm to Market Road in Mawoh (from Late quarter Head`s Resident to GS Mawoh to Mbanda black bush (1km)
Jul 21, 2022 C_TIKO SIGNE 60.0 million FCFA 001/C/MAYOR TIKO/TCTB/2022
Construction of a multipurpose youth empowerment centre in Tiko
2021 C_LIMBE_I ATTRIBUE
Supply of equipments to CMA Limbe
2020 C_TIKO ATTRIBUE
TIKO : Construction of a fishing center
2020 C_LIMBE_I ATTRIBUE
New botanic Garden - Limbe I: Construction of a fence wall to secure
2020 CU_LIMBE ATTRIBUE
FOR THE CONSTRUCTION OF ANNEX STRUCTURES AT MWANJA HOTEL
2017 PASEM ATTRIBUE
exécution des travaux de réhabilitation de certaines salles de classe dans les arrondissements de ma`an et campo phase 2
2017 PASEM ATTRIBUE
exécution des travaux d`entretien de la route "carrefour ZOUAMEYONG-EVOUMA village" dans la zone d`impact du barrage hydro électrique de MEMVE`ELE arrondissement de ma`an et campo
Jul 20, 2017 CU_LIMBE SIGNE 48.5 million FCFA 33/2017
Construction on certain structures for LCC
Prestataire: GRACELAND CORPORATION INACTIF