Construction of three manual boreholes at Mabeta and Motondo
REHABILITATION OF A BOREHOLE WITH ELECTRIC PUMP AND TOWER AT MANGA HILL-LIMBE III MUNICIPALITY
Construction of lock up stores at new Isokolo market
Supply of electricity to Mondoli village, Limbe III municipality
Construction of a borehole equipped with electric pump - Makuka
Construction of a block of two (02) classrooms-GS Mawoh
Construction of 12 lock-up stores
FOR THE CONSTRUCTION OF TWO SOLAR POWERED BOREHOLES WITH AN OVERHEAD-TANK AND STAND TAPS AT AKWA I AND GTTC AKWA -BAKASSI, NDIAN DIVISION.
May 10, 2023
C_IDENAU
SIGNE
74.4 million
FCFA
002/JO/IDICTB/2023
Construction of 12 lock-up stores
May 03, 2023
C_LIMBE_III
SIGNE
50.0 million
FCFA
010/JO/L.III.C/FAKO/L3CTB/PIB 2023
Supply of electricity to Mondoli village, Limbe III municipality
May 03, 2023
C_LIMBE_III
SIGNE
27.0 million
FCFA
009/JO/L.III.C/FAKO/L3CTB/PIB 2023
Construction of three manual boreholes at Mabeta and Motondo
May 03, 2023
C_LIMBE_III
SIGNE
17.7 million
FCFA
005/JO/L.III.C/FAKO/L3CTB/PIB 2023
REHABILITATION OF A BOREHOLE WITH ELECTRIC PUMP AND TOWER AT MANGA HILL-LIMBE III MUNICIPALITY
Apr 25, 2023
C_LIMBE_I
SIGNE
8.5 million
FCFA
05/LIC/FAKO/LIMBE I TB/PIB 2023
Construction of a borehole equipped with electric pump - Makuka
Apr 13, 2023
C_LIMBE_I
SIGNE
20.0 million
FCFA
03/JO/L.I.C/FAKO/LIMBE I TB/PIB 2023
Construction of a block of two (02) classrooms-GS Mawoh