sort by date sort by cost
Total 5 entries found , Cost: 126.0 million FCFA
2020 DR_MINEE_NW ATTRIBUE
NEKIEGHE STREET OF BAMBILI VILLAGE : DRINKING WATER SUPPLY (PHASE 2)
Prestataire: EXECUTIVE DREAM
Aug 05, 2020 C_NJIKWA SIGNE 10.0 million FCFA 03/JO/MINDDEVEL/NCITB/2020
CONSTRUCTION OF 3 METALLIC CULVERTS ALONG THE KONDA- BAKO ROAD AND REHABILITATION/PAVEMENT OF BAD SPOT AT THE NJIMUKOD HILL
Prestataire: EXECUTIVE DREAM
May 08, 2020 C_BENAKUMA SIGNE 39.8 million FCFA 001/JO/MINDEVEL/MAYOR/BC8/BCITB/MCH/2020
Extension of electricity within the Benakuma Town and supply of 2 transformers
Prestataire: EXECUTIVE DREAM
Mar 18, 2020 C_FURU-AWA SIGNE 59.1 million FCFA 002/JO/MINDDEVEL/MAYOR/FAC/FACITB/MCH/2020
Opening of an eleven (11) km road (Nangwa - Biando)
Prestataire: EXECUTIVE DREAM
Mar 12, 2020 C_BATIBO SIGNE 17.0 million FCFA JOB/BC/BCITB/2020
Rehabilitation of AMBO water supply scheme
Prestataire: EXECUTIVE DREAM

Top Prestataires
Top Dates