sort by date sort by cost
Total 2 entries found , Cost: 129.6 million FCFA
Nov 14, 2019 C_GALIM SIGNE 30.8 million FCFA 08/LC/CGAL/SG/CIPM/2020
CONSTRUCTION DU PONT FEU VIEUX AU PK 1+700 DU TRONCON DE ROUTE BAMENYAM INTER RD72-NZEUBA-LOTI ZAPOUO GALIM
Prestataire: ETS VICTORY MULTIPLE
Apr 22, 2019 C_GALIM SIGNE 98.8 million FCFA 001/LC/C GALIM/SG/2019
Construction d’une gare routière dans la ville de GALIM
Prestataire: ETS VICTORY MULTIPLE

Top Authorities
Top Prestataires
Top Dates