sort by date sort by cost
Total 3 entries found , Cost: 74.5 million FCFA
Dec 03, 2019 C_NKONGSAMBA_II RECEPTIONNE 22.3 million FCFA 06/LC/CAN-2/CIPM/2019
CONSTRUCTION DES LATRINES SÈCHES VENTILÉES DANS LES ÉCOLES PUBLIQUES ANNEXES Groupe 1A ET 1B
Prestataire: ETS TAYYIBA MISSING
Dec 03, 2019 C_NKONGSAMBA_II SIGNE 22.3 million FCFA 06/LC/CAN-2/CIPM/2019
CONSTRUCTION DES LATRINES SÈCHES VENTILÉES DANS LES ÉCOLES PUBLIQUES ANNEXES Groupe 1A ET 1B
Prestataire: ETS TAYYIBA MISSING
Jul 29, 2019 C_NGAMBE SIGNE 30.0 million FCFA 005/LC/C.NGBE/SG/SPM/2019
Construction de deux (02) forages éauipés de robinets et panneaux solaires dans les Villages Matol et Pimbo
Prestataire: ETS TAYYIBA MISSING

Top Prestataires
Top Dates