sort by date sort by cost
Total 3 entries found , Cost: 130.6 million FCFA
Oct 07, 2022 CDEN RECEPTIONNE 7.7 million FCFA 014/LC/MINEPIA/CDEN/CIPM/2022
Construction d`un parc de vaccination à Djohong
Aug 10, 2022 C_MEIGANGA SIGNE 30.0 million FCFA 19/LC/C-MGA/CIPM/2022
Achevement des travaux de Construction de quatorze(14) boutiques
Jan 31, 2022 C_MEIGANGA SIGNE 92.9 million FCFA 09/M/CMGA/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 02 BLOC DE 02 SALLES DE CLASSE EQUIPEES DE 60 TABLES BANC + BLOC ADMINISTRATIF CHACUN DANS LE EP DE LOKOTI GROUPE 2 ET EP HORE KOUNI CONSTRUCTION DE 01 BLOC DE 03 SALLES DE CLASSE EQUIPEES DE 90 TABLES BANCS A EP DAKERE ET CONSTRUCTION D UN BLOC LATRINES ECOLOGIQUES A 03 CABINES DANS LES EP HORE KOUNI ET EP DAKERE

Top Authorities
Top Prestataires
Top Dates