sort by date sort by cost
Total 3 entries found , Cost: 60.9 million FCFA
Aug 31, 2021 C_MOMBO RECEPTIONNE 18.4 million FCFA 01/COMMUNE MOMBO/ST/2021
Achèvement de l`Electrification de Boubou sur 03 km
Prestataire: ETS SCR ENGINEERING MULTIPLE
Jul 21, 2021 C_BARE_BAKEM SIGNE 15.1 million FCFA 004/LC/AONO/COMMUNE DE BARE/CIPM/2021
TRAVAUX DE REHABILITATION ET D`EXTENSION DE L`AEP DE PASSIM
Prestataire: ETS SCR ENGINEERING MULTIPLE
May 05, 2021 C_MANJO SIGNE 27.5 million FCFA 03/LC/CTD-MANJO/SG/2021
Construction d`une adduction d`eau potable à MIKOMBE
Prestataire: ETS SCR ENGINEERING MULTIPLE

Top Prestataires
Top Dates