sort by date sort by cost
Total 3 entries found , Cost: 54.0 million FCFA
May 19, 2020 C_TOUBORO RECEPTIONNE 18.0 million FCFA 005/LC/MO/C-TBRO/SG/CIPM/2020
Construction de 01 bloc de 02 salles de classe à l`EP de MBOKO (lot 1).
Prestataire: ETS SALI BOUBA MULTIPLE
May 19, 2020 C_TOUBORO RECEPTIONNE 18.0 million FCFA 004/LC/MO/C-TBRO/SG/CIPM/2020
Construction de 01 bloc de 02 salles de classe à l`EP de FOUMBANG (lot 3).
Prestataire: ETS SALI BOUBA MULTIPLE
May 19, 2020 C_TOUBORO SIGNE 18.0 million FCFA 005/LC/MO/C-TBRO/SG/CIPM/2020
Construction de 01 bloc de 02 salles de classe à l`EP de MBOKO (lot 1).
Prestataire: ETS SALI BOUBA MULTIPLE

Top Authorities
Top Prestataires
Top Dates