sort by date sort by cost
Total 5 entries found , Cost: 86.6 million FCFA
2019 C_MORA ATTRIBUE
TRAVAUX D’ENTRETIEN DE LA VOIRIE EN TERRE DANS LA VILLE DE MORA : VOIRIE LIEU DIT FOYER CULTUREL VERS DOMICILE LAMINE L =0,642Km, COMMUNE DE MORA, ARRONDISSEMENT DUDIT REGION DE L’EXTRÊME-NORD.
Prestataire: ETS SAABPOUNE
Aug 29, 2019 C_KOLOFATA SIGNE 31.2 million FCFA 007/LC/C.KTA/CIPM/2019
Construction du CEAC de KOLOFATA doté de l`éclairage photovoltaïque
Prestataire: ETS SAABPOUNE
Jul 26, 2019 C_KOLOFATA SIGNE 30.0 million FCFA 002/LC/C.KTA/CIPM/2019
KERAWA: Construction d`un CZV,
Prestataire: ETS SAABPOUNE
Jul 02, 2019 C_MAROUA_III SIGNE 18.9 million FCFA 002/LC/C.A.Mra 3/CIPM/2019
Construction d`un bloc de deux salles de classe d`IBBA MODOYEL
Prestataire: ETS SAABPOUNE
Apr 26, 2019 PREF_MAYO_SAVA RECEPTIONNE 6.5 million FCFA 001/LC/K44/CDPM/2019
Travaux de réhabilitation de la Sous préfecture de tokombéré
Prestataire: ETS SAABPOUNE INACTIF

Top Prestataires
Top Dates