sort by date sort by cost
Total 24 entries found , Cost: 402.4 million FCFA
2024 C_BALIKUMBAT ATTRIBUE
Acquisition and supply of a front head loader for the Balikumbat council;Balikumbat sub division in Ngoketunjia divission
2024 C_NDOP ATTRIBUE
The construction of a borehole powered by solar system at Ndop market (Old Park) in Ndop town Ndop Council Area
Jun 25, 2024 C_BALIKUMBAT SIGNE 90.7 million FCFA 001/CO/MINDDVEL/BC/BCITB/2024
Acquisition and supply of a front head loader for the Balikumbat council;Balikumbat sub division in Ngoketunjia divission
2023 C_BAMENDA_II ATTRIBUE
Construction of a borehole equipped with solar pump with 10m elevated storage tank of 3 cubic in Azire
2023 C_BABESSI ATTRIBUE
Construction of an industrial borehole powered with solar energy
Jun 08, 2023 C_BAMENDA_II SIGNE 14.5 million FCFA 06/JO/RQ/BIICITB/BIIC/BIISD/Mezam/NWR/2023
Construction of a borehole equipped with solar pump with 10m elevated storage tank of 3 cubic in Azire
May 16, 2023 C_BAMENDA_II SIGNE 14.7 million FCFA 07/JO/BIIC/BIISD/BIICITB/Mezam/2023
Construction of a borehole equipped with solar pump with 10m elevated storage tank of 3 cubic in mile 8 (Mankon)
Nov 16, 2022 PEA-JEUNES SIGNE 20.0 million FCFA 409/C/MINADER-MINEPIA/PEA-JEUNES/CN/SPM
CONSTRUCTION DE 05 FORAGES A ENERGIE SOLAIRE (LOT2 ) L`IAO OBALA
Nov 16, 2022 PEA-JEUNES SIGNE 20.0 million FCFA 411/C/MINADER-MINEPIA/PEA-JEUNES/CN/SPM
CONSTRUCTION DE 05 FORAGES A ENERGIE SOLAIRE (LOT5) NASARETH CENTER DE BAMENDA
Nov 16, 2022 PEA-JEUNES SIGNE 20.0 million FCFA 410/C/MINADER-MINEPIA/PEA-JEUNES/CN/SPM
CONSTRUCTION DE 05 FORAGES A ENRGIE SOLAIRE A L`ETA /CRA/EFES D`EBOLOWA (LOT4)
Jun 14, 2022 C_BALIKUMBAT RECEPTIONNE 50.0 million FCFA 02/JO/MINDDEVEL/NWR/NG/BC/BCITB/2022
Construction of a borehole each at Fombangum quarter in Balikumbat village, Baligashu square, Bafanji palace, Balikumbat community hall, main mission quarter Balikumbat and Baptist Church Akumom opposite the Muandido’s family Compound in Bamunkumbit village.
Jun 01, 2022 C_ANDEK SIGNE 8.0 million FCFA 08/JO/AC/ACITB/2022
Construction of a well at Andek Council Premises
Jun 01, 2022 C_ANDEK SIGNE 8.0 million FCFA 09/JO/AC/ACITB/2022
Construction of a well at Market square Andek
Jun 01, 2022 C_ANDEK SIGNE 8.0 million FCFA 06/JO/AC/ACITB/2022
Construction of a well at Bonatin Lot1
Jun 01, 2022 C_ANDEK SIGNE 8.0 million FCFA 07/JO/AC/ACITB/2022
Construction of a well at Baitei Square
May 09, 2022 C_BASSAMBA RECEPTIONNE 11.9 million FCFA 01/AONO/PR/MINMAP/SG/DRO/DD-MINMAP-NDE/C-BASSAMBA/CIPM-BASSAMBA/2022
Approvisionnement en eau potable à la cité municipale de Bassamba et construction d’un point d’eau au quartier quatre
Apr 01, 2022 C_MBENGWI SIGNE 44.2 million FCFA 07/JO/ONIT/MC/ITB/2022
Rehabilitation and Extension of Ngyen Mbo water scheme, Construction of 02 Boreholes in Mbon and Njindom
2021 C_MBENGWI ATTRIBUE
Construction of a mini-water supply scheme i, Wumtoh
Jun 23, 2021 C_SANTA SIGNE 8.0 million FCFA 013/JO/SC/SCITB/2021
Construction of a solar power borehole at Bamock
Jun 04, 2021 C_BASSAMBA RECEPTIONNE 21.2 million FCFA 003/LC/PR/MINMAP/SG/DRO/DD-MINMAP-NDE/DD-MINDDEVEL-NDE/C-BASSAMBA/CIPM-BASSAMBA/2021
Alimentation en eau potable du centre médical d`arrondissement de Bassamba.
Mar 10, 2021 C_MBENGWI SIGNE 11.7 million FCFA 01/JO/RQ/MC/ITB/2021
The supply of Covid-19-19 equipment to Mbengwi
Aug 06, 2020 C_NTUI SIGNE 16.5 million FCFA 006/LC/C-NTUI/SG/CIPM/2020
Construction d’une AEP au nouveau quartier administratif TAMBA
May 29, 2019 C_MBENGWI SIGNE 19.7 million FCFA 01/ONIT/MC/CTB//2019
CONSTRUCTION OF A BLOCK OF TWO CLASSROOMS IN GNS WUMTOH
Prestataire: ETS NJANKA CONSTRUCTION INACTIF
Apr 20, 2018 DR_ADMINISTRATION_PENITENTIAIRE_SW SIGNE 7.4 million FCFA 007/JO/PR/MINMAP/SWRD/SWRTB/2018
Rehabilitation works at the South West Regional branch of penitentiary administration
Prestataire: ETS NJANKA CONSTRUCTION 2months