sort by date sort by cost
Total 5 entries found , Cost: 119.9 million FCFA
May 23, 2022 C_FONFUKA RECEPTIONNE 20.0 million FCFA 00005/JO/ONIT/MINDDEVEL/FC/FCITB/PIB/2022
Construction of a concrete Box culvert in stone masonry with a reinforced concrete slab along the road linking G.S Kimbi and Bonanjo quarter.
May 23, 2022 C_FONFUKA RECEPTIONNE 24.9 million FCFA 00007/JO/ONIT/MINDDEVEL/FC/FCITB/PIB/2022
Construction of a bridge over river Mban in the Fonfuka- Balamua-Misaje road of span 4m,width 7m and height 6m in Bum sub division, Boyo Division, North West Region (LOT 2)
Apr 28, 2022 C_NKAMBE SIGNE 16.0 million FCFA 010/JO/NWR/DMD/NK.C/K.CITB/2022
Rehabilitation of the lower Mbot water scheme and extension of community water in Yamba Mbot
Apr 28, 2022 C_NKAMBE SIGNE 19.0 million FCFA 011/JO/NWR/DMD/NK.C/NK.CITB/20222
Rehabilitation of the Tabenken water scheme
May 13, 2021 C_FONFUKA RECEPTIONNE 40.0 million FCFA 0012/JO/ONIT/FC/FCITB//PO/RFNNWR/2021
CONSTRUCTION OF 02 BRIDGES ALONG THE ROAD LINKING FONFUKA HEALTH CENTRE TO MBUK VILLAGE