sort by date sort by cost
Total 2 entries found , Cost: 6.3 million FCFA
2018 C_DIBAMBA ATTRIBUE
Maitrise d’œuvre technique des travaux de construction des marchés de Missollé II et de Kopongo.
Prestataire: ETS MMG BTP MISSING
Apr 17, 2018 C_NKONDJOCK SIGNE 6.3 million FCFA 001/LC/MINMAP/DRMAP-LT/DDMAP/CDPM/NKAM/20108
CSI de MABOMBE: equipement en materiel medical
Prestataire: ETS MMG BTP MISSING

Top Prestataires
Top Dates