sort by date sort by cost
Total 3 entries found , Cost: 73.7 million FCFA
Jun 08, 2020 C_BANGANTE RECEPTIONNE 27.7 million FCFA 14/LC/PR/MINMAP/DRO/DDNDE/C-BGTE/SPM/CIPM/2020
Réhabilitation des routes communales (LOT 1)
Apr 15, 2020 C_BASSAMBA RECEPTIONNE 28.6 million FCFA 02/LC/PR/MINMAP/SG/DRO/DDNDE/CIPM-BASSAMBA/C-BASSAMBA/2020
Ouverture de la piste Nekin 2 – Noulong avec construction de 2 dalots (Bassamba) (LOT 2)
Apr 15, 2020 C_BASSAMBA RECEPTIONNE 17.4 million FCFA 03/LC/PR/MINMAP/SG/DRO/DDNDE/CIPM-BASSAMBA/C-BASSAMBA/2020
Ouverture de la piste Ecole Publique Bilingue de Bassamba-qtier newton (LOT 3)

Top Prestataires
Top Dates