sort by date sort by cost
Total 8 entries found , Cost: 240.8 million FCFA
Jun 08, 2020 C_BANGANTE RECEPTIONNE 27.7 million FCFA 14/LC/PR/MINMAP/DRO/DDNDE/C-BGTE/SPM/CIPM/2020
Réhabilitation des routes communales (LOT 1)
Apr 15, 2020 C_BASSAMBA RECEPTIONNE 17.4 million FCFA 03/LC/PR/MINMAP/SG/DRO/DDNDE/CIPM-BASSAMBA/C-BASSAMBA/2020
Ouverture de la piste Ecole Publique Bilingue de Bassamba-qtier newton (LOT 3)
Apr 15, 2020 C_BASSAMBA RECEPTIONNE 28.6 million FCFA 02/LC/PR/MINMAP/SG/DRO/DDNDE/CIPM-BASSAMBA/C-BASSAMBA/2020
Ouverture de la piste Nekin 2 – Noulong avec construction de 2 dalots (Bassamba) (LOT 2)
May 28, 2018 DD_MINTP_HAUT_NKAM SIGNE 53.4 million FCFA 06/M/MINMAP/DR-OU/DD-HNK/CDPM-RTE/2018
rehabilitation du tronçon de route Basso-Chefferie Badoumla-Carrefour Badoumla
May 11, 2018 C_BANGANTE SIGNE 10.0 million FCFA 008/LC/PR/MINMAP/DRO/DDNDE/SPM/CIPM-BGTE/C-BGTE/2018
OUVERTURE DE LA PISTE ECOLE PUBLIQUE MADOUM 2 km
Mar 15, 2018 DD_MINEE_NDE SIGNE 10.5 million FCFA 03/LC/PR/MINMAP/SG/DRO/DDNDE/SPM/CDPM-NDE/2018
REHABILITATION DE NEUF FORAGE DANS L`ARRRONDISSEMENT DE BAZOU
May 28, 2018 DD_MINTP_HAUT_NKAM ATTRIBUE 53.4 million FCFA 06/M/MINMAP/DR-OU/DD-HNK/CDPM-RTE/2018
rehabilitation du tronçon de route Basso-Chefferie Badoumla-Carrefour Badoumla
Mar 27, 2017 C_BANA RECEPTIONNE 39.9 million FCFA 07/LC/MINMAP/DR-OU/DD-HNK/CDPM-RTE/2017
TRAVAUX DE RÉHABILITATION DU TRONÇON DE ROUTE BASSO-CHEFFERIE BADOUMLA-CARREFOUR BADOUMLA
Prestataire: ETS MAYOU BUSINESS INACTIF 12months

Top Prestataires