sort by date sort by cost
Total 4 entries found , Cost: 30.3 million FCFA
2023 C_BONDJOCK ATTRIBUE
Construction d`un hangar pour unité de production des pavés et parpaings à Bondjock
Prestataire: ETS MAYA MULTIPLE
2023 C_BONDJOCK ATTRIBUE
Ouverture de la route de Nkong Keni Château-Song Gan 1,5 km
Prestataire: ETS MAYA MULTIPLE
Jun 09, 2023 SOWEDA SIGNE 15.9 million FCFA 012/JO/SOWEDA/MINADER/23
Construction of Maize Dryer in Nyan-Nkikoh
Prestataire: ETS MAYA MULTIPLE
May 17, 2023 SOWEDA SIGNE 14.3 million FCFA 008/23/MINADER/PIB/23
SUPPLY AND INSTALLATION OF WIRELESS WEATHER STATION 2023
Prestataire: ETS MAYA MULTIPLE

Top Prestataires
Top Dates