sort by date sort by cost
Total 2 entries found , Cost: 28.0 million FCFA
Oct 10, 2022 C_MOUTOURWA SIGNE 10.0 million FCFA 10/LC/C.MTWA/CIPM/AI/2022
Travaux de gestion des sites reboisés << opération sahel vert >> (Mordok-Badjova-Yiwa-Missilia)
Prestataire: ETS MASSIVE DYNAMIC MULTIPLE
Aug 24, 2022 C_TOULOUM SIGNE 18.0 million FCFA 15/LC/C.TLM/CIPM/BEC/2022
Construction d`un bloc de 02 salles de classe à Golondakri
Prestataire: ETS MASSIVE DYNAMIC MULTIPLE

Top Prestataires
Top Dates