Jun 13, 2017
C_BANGOU
RECEPTIONNE
15.2 million
FCFA
08/LC/C-BANGOU/CIPM/2017
CONSTRUCTION D`UN DALOT SIMPLE AVEC AMÉNAGEMENT DES VOIES D’ACCÈS DE PART ET D`AUTRE SUR LA RIVIÈRE TSELA-LOUK Lot 2
Jun 13, 2017
C_BANGOU
SIGNE
16.3 million
FCFA
08/LC/C-BGOU/CIPM/2017
CONSTRUCTION D`UN DOUBLE DALOT AVEC AMÉNAGEMENT DES VOIES D’ACCÈS A BAZIEZE PAR BANGOU Lot 3
Jun 02, 2017
C_PETE_BANDJOUN
RECEPTIONNE
27.0 million
FCFA
04/LC/CPB/CIPM-NEC/2017
TRAVAUX DE BITUMAGE DU TRONCON CARREFOUR TROIS VILLAS-CENTRE CLIMATIQUE DANS L`ARRONDISSEMENT DE POUMOUGNE
Jun 02, 2017
C_PETE_BANDJOUN
SIGNE
40.0 million
FCFA
05/LC/CPB/CIPM-BEC/2017
Bandjoun:Travaux d’aménagements des carrefours, axes structurants et des places urbains
Apr 24, 2017
C_BABESSI
SIGNE
18.0 million
FCFA
02/JO/MINATD/BC/BCITB/2017
Construction of a block of 2 classrooms at GBPS Mboghombam, lot 2
Apr 24, 2017
C_BALIKUMBAT
SIGNE
8.0 million
FCFA
26/JO/MINATD/BC/BCITB/2017
Construction of a borehole with HPM at Joguru-Balikumbat
Mar 22, 2017
C_NDOP
RECEPTIONNE
17.6 million
FCFA
03/JO/VOL/I/250/MINATD/NC/NCITB/2017
Construction of classrooms in G.N.S Mbeah, lot 1
Mar 22, 2017
C_NDOP
RECEPTIONNE
21.0 million
FCFA
04/JO/MINATD/NC/NCITB/2017
Construction of classrooms in G.S Mbangsalle, lot 3
Residence/DDMINTP: water supply