sort by date sort by cost
Total 2 entries found , Cost: 85.5 million FCFA
Sep 14, 2023 C_DOUALA_V SIGNE 30.5 million FCFA 013/LC/AONO/CAD5/CIPM/23
TRAVAUX DE CONSTRUCTION D`UN PONCEAU RELIANT MAKEPE 2 ET MAKEPE 3 ET LE LYCEE LOGPOM
Prestataire: ETS MAF BTP MULTIPLE
Sep 14, 2023 C_DOUALA_V SIGNE 55.0 million FCFA 06/M/ONO/CAD5/CIPM/23
Construction des dalots (Logbessou, Makepé Missoké et autres)
Prestataire: ETS MAF BTP MULTIPLE

Top Authorities
Top Prestataires
Top Dates