sort by date sort by cost
Total 6 entries found , Cost: 185.8 million FCFA
Jun 25, 2019 PREF_NYONG_ET_KELLE RECEPTIONNE 10.0 million FCFA 005/LC/RCE/J65JO8/CDPM/2019
BOT-MAKAK: Réhabilitation de la Sous-Préfecture
Prestataire: ETS M.J.N MISSING
May 29, 2019 C_MAYO_DARLE RECEPTIONNE 27.8 million FCFA 004/LC/SG/STADU/C°MDLE/CIPM/MAYO-DARLE/2019
Réhabilitation de la route Mbalang-Dorofi Cameroun- Koradje
Prestataire: ETS M.J.N MISSING
May 29, 2019 C_MAYO_DARLE RECEPTIONNE 28.0 million FCFA 005/LC/SG/STADU/C°MDLE/CIPM/MAYO-DARLE/2019
Ouverture et réhabilitation de la piste agricole PANGARI Mayo- Seni – MBANGUERI (phase I) 20 km
Prestataire: ETS M.J.N MISSING
May 29, 2019 C_MAYO_DARLE RECEPTIONNE 75.0 million FCFA 003/LC/SG/STADU/C°MDLE/CIPM/MAYO-DARLE/2019
Ouverture la route YIMBERE Chefferie BOUNOUKOUM avec bretelles
Prestataire: ETS M.J.N MISSING
May 29, 2019 C_MAYO_DARLE RECEPTIONNE 25.0 million FCFA 006/LC/SG/STADU/C°MDLE/CIPM/MAYO-DARLE/2019
Construction d’un pont sur la rivière NGUE NGUE
Prestataire: ETS M.J.N MISSING
May 29, 2019 DD_MINEFOP_MAYO_BANYO SIGNE 20.0 million FCFA 001/LC/H50/SAFF/2019
(DD MINEFOP MAYO BANYO) SAR/SM SONGKOLONG: Poursuite de la construction de l`atelier de Menuiserie à la SAR/SM
Prestataire: ETS M.J.N MISSING

Top Prestataires
Top Dates