sort by date sort by cost
Total 1 entries found , Cost: 83.0 million FCFA
Jan 31, 2022 C_DIR SIGNE 83.0 million FCFA 008/M/C.DIR/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 02 BLOCS DE 02 SALLES DE CLASSE EQUIPEES DE 120 TABLE BANCS AU CES DE KALALDI ET AU LYCEE DE DIR ET TRAVAUX DE CONSTRUCTION DE 02 BLOCS DE 02 SALLES DE CLASSE EQUIPEES DE 60 TABLE BANCS AVEC LATRINES A 03 CABINES A L EP DE SOURMA
Prestataire: ETS LE PROGRES MULTIPLE

Top Authorities
Top Prestataires
Top Dates