sort by date sort by cost
Total 2 entries found , Cost: 70.0 million FCFA
2018 DR_MINT_NW ATTRIBUE
Control and supervision for the construction of the Regional Delegation of MINT (phase IV)
Dec 28, 2018 MINEPAT SIGNE 70.0 million FCFA 0148/LC/MINEPAT/CMSPM/2018
Maîtrise d`oeuvre pour réhabilitation de trois (03) tronçons de route rurales et construction d`un pont sur la rivière SUH à Konchep département du Ndonga Mantung

Top Dates