sort by date sort by cost
Total 4 entries found , Cost: 75.0 million FCFA
2023 MINDCAF ATTRIBUE
Étude en vue du renforcement de la fiabilité des mappes foncières Phase 3
2023 C_KONYE ATTRIBUE
Construction of an IHC in Mantondo II.
Jun 09, 2023 MINDCAF SIGNE 25.0 million FCFA 08/LC/MINDCAF/CIPM/2023
Étude en vue du renforcement de la fiabilité des mappes foncières Phase 3
Apr 19, 2023 C_KONYE SIGNE 50.0 million FCFA N02/JO/KONYE/MEME/ITB/2023 LOT 1
Construction of an IHC in Mantondo II.

Top Authorities
Top Dates