Total
24
entries found
, Cost: 393.6 million FCFA
Construction of a bridge over river NTEN-TEH and masonry box culvert with a reinforced concrete slab along the MFUMTE - GOM road NWA Sub Division
Construction of two classroom in G.S SABONGARI
May 09, 2023
C_NWA
SIGNE
22.0 million
FCFA
02/JO/MINDDEVEL/NWR/DMD/NC/NCITB/2023
Construction of two classroom in G.S SABONGARI
Apr 04, 2023
C_NWA
SIGNE
35.0 million
FCFA
06/JO/MINDDEVEL/NWR/DMD/NC/NCITB/2023
Construction of a bridge over river NTEN-TEH and masonry box culvert with a reinforced concrete slab along the MFUMTE - GOM road NWA Sub Division
For the construction of a block of two (02) classrooms at GS TUM(relocated to GS JAH )Nwa
For the construction of a block of two (02) classrooms at GS Nwa
For the construction of a block of two (02) classrooms at GS BOMGOR ( relocated to GS MFE)
For the Construction of a Block of two (02) classrooms at GS FETOP (relocated to GS SHIE)
For the construction of an Administrative block in GNS SIH
May 31, 2022
C_NWA
SIGNE
50.0 million
FCFA
04/JO/MINDDEVEL/NWR/DMD/NC/NCITB/2022
Construction of Lih Health Centre
Construction of a warehouse in the Sabongari new Market, Nwa sub Division
Aug 10, 2020
C_ELAK-OKU
SIGNE
19.0 million
FCFA
02/JO/MINDDEVEL/EC/ECITB/2020
Contruction of a block of two classrooms and offices at GBPS Elak
Jun 04, 2020
C_NWA
SIGNE
40.0 million
FCFA
01/JO/MINDDEVEL/NWR/NC/NCITB/2020
COMMUNE DE NWA : Deuxième phase de la construction du marché de Sabongari NWA COUNCIL : Second phase construction of market at Sabongari
Jul 26, 2019
C_ELAK-OKU
SIGNE
30.0 million
FCFA
08/JO/EC/ECITB/2019
CONSTRUCTION OP ZO-TECHNICAL AND VETERANY CENTER
Jul 15, 2019
C_ELAK-OKU
SIGNE
19.0 million
FCFA
07/JO/EC/ECITB/2019
GBPS ELAK; CONSTRUCTION OF A BLOCK OF TWO CLASSROOMS(LOT1)
Jun 20, 2019
C_NWA
SIGNE
50.0 million
FCFA
04/JO/MINDDEVEL/NWR/NC/NCITB/2019
Construction of 50 market sheds at Sabongari market
GS NGEMSIBA II OKU: construction of 02 classrooms Lot 1
GNS MBAN CHAM- Construction of a Nursery Block at GNS Mban cham Oku. Lot 2
GNS LANG OKU - Construction of 02 two classrooms Lot 2
For the construction of an electrical workshop at GTHS Misaje in misaje sub Division
DD MINEFOP SAR/SM MISAJE: Construction of one blocks of 2 classrooms with the head master office of the SAR/SM
Mar 13, 2018
GSS_ICHIM-OKU
SIGNE
20.0 million
FCFA
02/18/JO/DDM/BDTB/2018
GSS ICHIM : Construction of a block of 02 classrooms lot 3
Apr 12, 2017
C_NWA
SIGNE
44.9 million
FCFA
13/JO/RDNMAP/NWRTB/2017
Construction of YANG IHC in NWA
Apr 05, 2017
GNS_MBANDE
RECEPTIONNE
9.4 million
FCFA
009/JO/MINMAP/RDNW/DDD-M/DMDTB/2017
GNS Mbande - Construction of nursery classrooms, lot 2