sort by date sort by cost
Total 2 entries found , Cost: 154.9 million FCFA
Jul 13, 2017 DD_MINEE_MAYO_TSANAGA SIGNE 70.0 million FCFA 015/M/PR/MINMAP/SG/DREN/SMAS/BSMA/17
TRAVAUX DE REHABILITATION D UNE ADDUCTION D EAU POTABLE A MIDJVIN
Prestataire: ETS ETRA MULTIPLE
Jun 22, 2017 MINADER SIGNE 84.9 million FCFA 009/M/PR/MINMAP/DREN/CRPM-TBEC/SMAS/CBSA/17
TRAVAUX DE CONSTRUCTION D UNE UNITE DE STOCKAGE DE RIZ, D UN LOCAL DE GROUPE ELECTROGENE ET LA FOURNITURE D UN GROUPE ELECTROGENE
Prestataire: ETS ETRA MULTIPLE

Top Prestataires
Top Dates