sort by date sort by cost
Total 6 entries found , Cost: 213.0 million FCFA
Oct 15, 2022 C_TOKOMBERE SIGNE 10.0 million FCFA 19/LC/C.TOK/CIPM-BEC/2022
Réhabilitation du centre de promotion de la femme et de la famille de Tokombéré (CPFF)
Prestataire: ETS EL BACHIR MULTIPLE
Aug 05, 2021 CU_MAROUA SIGNE 63.0 million FCFA 0007/M/CUM/CIPM-TR/2021
Assainissement de la route grande mosquée Dougoi-Hotel Oasis dans la commune de Maroua 3e
Prestataire: ETS EL BACHIR MULTIPLE
Jun 29, 2020 C_PETTE SIGNE 35.0 million FCFA 09/LC/C-PETTE/CIPM/2020
CMA PETTEL: construction de logement d`astreinte
Prestataire: ETS EL BACHIR MULTIPLE
Jun 29, 2020 C_PETTE SIGNE 35.0 million FCFA 03/LC/C-PETTE/CIPM/2020
CSI DOUBBEL: construction de logement d`astreinte
Prestataire: ETS EL BACHIR MULTIPLE
Jun 29, 2020 C_PETTE SIGNE 35.0 million FCFA 08/LC/C-PETTE/CIPM/2020
CSI MALAM PETTEL: construction de logement d`astreinte
Prestataire: ETS EL BACHIR MULTIPLE
Jun 29, 2020 C_PETTE SIGNE 35.0 million FCFA 04/LC/C-PETTE/CIPM/2020
CSI DJAOUDE: construction de logement d`astreinte
Prestataire: ETS EL BACHIR MULTIPLE

Top Prestataires