sort by date sort by cost
Total 2 entries found , Cost: 80.0 million FCFA
Jul 06, 2017 MINEPAT SIGNE 33.3 million FCFA 018/LC/PR/CDPM/DJA ET LOBO/17
Construction d`une mini adduction d`eau potable à Ebolembwang
Prestataire: ETS ECODIS CAMEROUN MISSING
May 31, 2017 DR_MINTOUL_NO SIGNE 46.6 million FCFA 012/LC/PR/MINMAP/DR-NO/CRPM/SMI/2017
Construction clôture avec guérite Lot 1
Prestataire: ETS ECODIS CAMEROUN MISSING

Top Prestataires
Top Dates