Total 2 entries found , Cost: 186.2 million FCFA
Oct 25, 2018 C_BASCHEO RECEPTIONNE 23.5 million FCFA 001/LC/C-Bascheo/CIPM-BE/2018
NARO BOMBOL: Réhabilitation de la piste agricole (08km)
Prestataire: ETS DJAMOUSS 8months
Jul 17, 2018 DR_MINTP_NO SIGNE 162.7 million FCFA 063/LC/MINMAP/DR-NO/CRPMP/SMI/BST/BEC/2018
Travaux de construction de la DRTP de Garoua
Prestataire: ETS DJAMOUSS 5months