sort by date sort by cost
Total 6 entries found , Cost: 39.0 million FCFA
2022 PREF_FAKO ATTRIBUE
Construction of an Industrial Chemistry Laboratory at the Government Bilingual Technical High School (GBTHS) Limbe FAKO
Prestataire: ETS D.E. ESAKA
May 21, 2021 PREF_FAKO SIGNE 22.0 million FCFA 01/D/SWR/FD/SDO/FAKO/2021
Construction of a block of two classrooms at GHS Batoke, Limbe II
Prestataire: ETS D.E. ESAKA
2020 PREF_FAKO ATTRIBUE
BONADIKOMBO NEW LAY OUT: Rural Electrification
Prestataire: ETS D.E. ESAKA
2020 PREF_FAKO ATTRIBUE
GHS BATOKE - LIMBE II: Construction of a block of two(02)classrooms
Prestataire: ETS D.E. ESAKA
2019 C_NGUTI ATTRIBUE
NGUTI : Elaboration of vocational training and retraining of insertion and reinsertion plan
Prestataire: ETS D.E. ESAKA
Apr 27, 2017 C_NGUTI SIGNE 17.0 million FCFA 001/JO/DDMINMAPKM/KMDTB/SWR/2018
Construction of two classrooms at Gs Mungo Ndor
Prestataire: ETS D.E. ESAKA

Top Prestataires