Total 6 entries found , Cost: 141.6 million FCFA
Mar 22, 2019 C_JAKIRI SIGNE 49.5 million FCFA 02/A/JO/JCITB/JC/2019
Ntunir: Electrification(LOT1)
Prestataire: ETS BLANCHE ET FILS MULTIPLE
Mar 22, 2019 C_JAKIRI SIGNE 11.6 million FCFA 03A/JO/JC/JCITB/2019
Construction of water scheme Ntur(LOT1)
Prestataire: ETS BLANCHE ET FILS MULTIPLE
Mar 22, 2019 C_JAKIRI SIGNE 24.1 million FCFA 03B/JO/JC/JCITB/2019
Construction of water scheme Nyaan
Prestataire: ETS BLANCHE ET FILS MULTIPLE
Mar 22, 2019 C_JAKIRI SIGNE 31.1 million FCFA 01/B/JO/JC/JCITB/2019
ELECTRIFICATION OF SHUKAI(LOT2)
Prestataire: ETS BLANCHE ET FILS MULTIPLE
Mar 22, 2019 C_JAKIRI SIGNE 9.7 million FCFA 01/A/JO/JCITB/JC/2019
ELECTRIFICATION OF TAATE(LOT1)
Prestataire: ETS BLANCHE ET FILS MULTIPLE
Mar 22, 2019 C_JAKIRI SIGNE 15.5 million FCFA 02B/JO/JC/JCITB/2019
Ran Electrification(LOT2)
Prestataire: ETS BLANCHE ET FILS MULTIPLE