sort by date sort by cost
Total 5 entries found , Cost: 78.0 million FCFA
2024 C_MAYO_BALEO ATTRIBUE
Construction du CPC de Gourwalti (lot 1)
Prestataire: ETS BINKOLA MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 30.0 million FCFA 04/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`un atelier de mécanique SAR/SM de Tignère
Prestataire: ETS BINKOLA MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 23.0 million FCFA 05/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Ouverture de la piste agricole Sadek-Mayo Rokongo 1 et 2
Prestataire: ETS BINKOLA MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 15.0 million FCFA 03/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`une cuisine servant à l`apprentissage volet restauration au CPFF de Tignère
Prestataire: ETS BINKOLA MULTIPLE
Apr 26, 2024 C_MAYO_BALEO SIGNE 10.0 million FCFA 06/LC/CMB/CIPM/ST/SG/2024
Construction du CPC de Gourwalti (lot 1)
Prestataire: ETS BINKOLA MULTIPLE

Top Prestataires
Top Dates