sort by date sort by cost
Total 3 entries found , Cost: 287.2 million FCFA
Nov 09, 2020 C_BANGANTE SIGNE 60.0 million FCFA 05/M/PR/MINMAP/DRO/DDNDE/SPM/CIPM-BGTE/2020
POUR L`EQUIPEMENT DE L`HOTEL DE VILLE DE BANGANGTE
Prestataire: ETS BETTER BUILDING INACTIF -13months
Sep 15, 2020 C_PETE_BANDJOUN SIGNE 197.7 million FCFA 003/M/CPB/SG/CIPM-RIR/2020
EXECUTION DES TRAVAUX DE BITUMAGE ECONOMIQUE EN ENDUIT BICOUCHE DU TRONCON DE ROUTE CARREFOUR SIM DZEDZE-CARREFOUR SIMKE LONG DE 1500ML DANS LA COMMUNE DE PETE BANDJOUN.
Prestataire: ETS BETTER BUILDING INACTIF -15months
Feb 12, 2020 C_PENKA-MICHEL SIGNE 29.5 million FCFA 05/LC/CPM/SG/CIPM/2020
CONSTRUCTION D`UN BLOC MATERNEL ET D`UN BLOC LATRINES A SIX(06) COMPARTIMENTS A L’ÉCOLE MATERNEL BILINGUE DE PENKA-MICHEL
Prestataire: ETS BETTER BUILDING INACTIF -22months

Top Prestataires
Top Dates